My highly experienced technical inspector had never seen such quick and well-organised work, and he has seen a lot. Even I couldn’t believe the speed. As a result, I was behind schedule with purchasing the machinery and selecting the facing materials, which slowed the construction down a bit. The building was delivered in a turnkey state in 2.5 months (from March 16, when the first column was erected, to May 30). This is exceptionally good performance with quality materials and work. I can certainly recommend them.
György SzabóManaging DirectorSzabó Suzuki - Mazda
On schedule, excellent quality
The Company performed the manufacture of a good quality steel secondary support structure, on schedule and for a favourable price. They were flexible in handling the modifications and additions brought by the designer and others, thus ensuring that construction continued uninterrupted.
Zoltán OláhTechnical ManagerSole Mizo projekt, Hexasteel Kft.